Author : D.J. Littler
Publisher : Elsevier
Page : 599 pages
File Size : 31,76 MB
Release : 2013-10-22
Category : Technology & Engineering
ISBN : 1483287483
The introduction of new 500 MW and 660 MW turbine generator plant in nuclear, coal- and oil-fired power stations has been partly responsible for the increase in generating capacity of the CEGB over the last 30 years. This volume provides a detailed account of experience gained in the development, design, manufacture, operation and testing of large turbine-generators in the last 20 years. With the advance in analytical and computational techniques, the application of this experience to future design and operation of large turbine-generator plant will be of great value to engineers in the industry.