[PDF] Safety Evaluation Report Related To The License Renewal Of The Edwin I Hatch Nuclear Plant eBook
Safety Evaluation Report Related To The License Renewal Of The Edwin I Hatch Nuclear Plant Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Safety Evaluation Report Related To The License Renewal Of The Edwin I Hatch Nuclear Plant book. This book definitely worth reading, it is an incredibly well-written.
The safety evaluation report documents the technical review of Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, license renewal application by the U.S. Nuclear Regulatory Commission staff.
This safety evaluation report, documents the technical review of the Palisades Nuclear Plant license renewal application by the U.S. Nuclear Regulatory Commission Staff.
This document is a supplemental safety evaluation report (SSER) on the application for license renewal for the Browns Ferry Nuclear Plant (BFN), as filed by Tennessee Valley Authority (TVA or the applicant). By letter dated December 31, 2003, TVA submitted its application to the U.S. Nuclear Regulatory Commission (NRC or the Commission) for renewal of the BFN operating licenses for an additional 20 years. The NRC staff (the staff) issued a safety evaluation report (SER), dated January 12, 2006, which summarizes the results of its safety review of the renewal application for compliance with the requirements of Title 10, Part 54, of the Code of Federal Regulations, (10 CFR Part 54), “Requirements for Renewal of Operating Licenses for Nuclear Power Plants.”
The safety evaluation report documents the technical review of the Vogtle Electric Generating Plant, Units 1 and 2 license renewal application by the United States Nuclear Regulatory Commission staff.
This document is a safety evaluation report (SER) on the license renewal application (LRA) for Columbia Generating Station (Columbia), as filed by Energy Northwest (the applicant). By letter dated January 19, 2010, Energy Northwest submitted its application to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the Columbia operating license for an additional 20 years. The NRC staff (the staff) prepared this report to summarize the results of its safety review of the LRA for compliance with Title 10, Part 54, “Requirements for Renewal of Operating Licenses for Nuclear Power Plants,” of the Code of Federal Regulations (10 CFR Part 54). The NRC project manager for the license renewal review is Arthur D. Cunanan.