[PDF] Proposed Base Realignment And Closure Implementation Plan For The Philadelphia Naval Complex eBook

Proposed Base Realignment And Closure Implementation Plan For The Philadelphia Naval Complex Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Proposed Base Realignment And Closure Implementation Plan For The Philadelphia Naval Complex book. This book definitely worth reading, it is an incredibly well-written.

Proposed Base Realignment and Closure Implementation Plan for the Philadelphia Naval Complex

Author :
Publisher :
Page : pages
File Size : 12,42 MB
Release : 1992
Category : Military base closures
ISBN :

GET BOOK

This plan consists of an introductory section describing the existing conditions of the NAVBASE including the activities, mission requirements, base loading, location, and land and facility owners. Secondly, it discusses an overall description of the base closure and realignment processes including leasing, disposal (real and personal property), records management, NEPA, and the historical and cultural resources processes. Thirdly, the plan develops various realignment proposals to assist in the determination of a recommended alternative. Lastly, the plan establishes plans of action and milestones for activities realigning, closing or relocating.

Base Realignment and Closure Cleanup Plan

Author :
Publisher :
Page : 348 pages
File Size : 17,83 MB
Release : 1994
Category : Hazardous waste site remediation
ISBN :

GET BOOK

This Base Realignment and Closure (BRAC) Cleanup Plan (BCP) describes the status, management and response strategy, and action items related to Cameron Station's ongoing environmental restoration and associated compliance programs. These programs support full - restoration of the installation property, which is necessary to meet the requirements for property disposal and reuse activities associated with the closure of the installation. The scope of the BCP considers the following regulatory mechanisms: the BRAC Act; National Environmental Policy Act (NEPA); Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Community Environmental Response Facilitation Act (CERFA); Resource Conservation and Recovery Act (RCRA); and other applicable laws. The Cameron Station BCP is a dynamic planning document which was developed by a BRAC Cleanup Team (BCT) consisting of U.S. Army, U.S. Environmental Protection Agency Region III (USEPA), and State of Virginia Department 9f Environmental Quality (VDEQ) representatives. It was necessary to make certain assumptions and interpretations to develop the schedule and cost estimates provided in this plan. The BCP will be updated regularly to reflect the current status and strategies of remedial actions, compliance programs and disposal and reuse planning. This document is the second in a series of updates/modifications and represents conditions and strategies as of January 1995.

Base Closures

Author : United States. Congress. House. Committee on Armed Services. Subcommittee on Military Installations and Facilities
Publisher :
Page : 268 pages
File Size : 42,93 MB
Release : 1991
Category : Military bases
ISBN :

GET BOOK

Military Base Realignments and Closures

Author : Brian J. Lepore
Publisher : DIANE Publishing
Page : 23 pages
File Size : 18,18 MB
Release : 2010-11
Category :
ISBN : 1437925472

GET BOOK

DoD¿s cost estimates to implement recommendations from the most recent Base Realignment and Closure (BRAC) round have steadily increased each budget year since 2005. This BRAC round is the fifth such round undertaken by DoD since 1988 and, it is the biggest, most complex, and costliest BRAC round ever. To implement BRAC 2005, DoD plans to spend nearly $35 billion. This review of DoD's FY 2010 BRAC budget indicates that DoD plans to spend more to implement BRAC 2005 recommendations compared to last year's BRAC budget. DoD's estimated one-time costs to implement this BRAC round increased by almost $2.5 billion from FY 2009 to FY 2010, bringing the total implementation cost estimate for this BRAC round to $34.9 billion. Illustrations.

Mare Island Naval Shipyard BRAC Cleanup Plan

Author : United States. Navy. Engineering Field Activity West
Publisher :
Page : pages
File Size : 45,50 MB
Release : 1997
Category : Military base conversion
ISBN :

GET BOOK