[PDF] Final Supplemental Environmental Impact Statement For The Silver State Solar South Project And Proposed Las Vegas Field Office Resource Management Plan Amendment eBook

Final Supplemental Environmental Impact Statement For The Silver State Solar South Project And Proposed Las Vegas Field Office Resource Management Plan Amendment Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Final Supplemental Environmental Impact Statement For The Silver State Solar South Project And Proposed Las Vegas Field Office Resource Management Plan Amendment book. This book definitely worth reading, it is an incredibly well-written.

Federal Register

Author :
Publisher :
Page : 138 pages
File Size : 30,6 MB
Release : 2014
Category : Delegated legislation
ISBN :

GET BOOK

Final Environmental Impact Statement for the Silver State Solar Energy Project (NVN-085077)

Author : United States. Bureau of Land Management. Las Vegas Field Office
Publisher :
Page : pages
File Size : 28,42 MB
Release : 2010
Category : Electric power transmission
ISBN :

GET BOOK

The Bureau of Land Management (BLM) Las Vegas Field Office has prepared this Final Environmental Impact Statement (FEIS) in response to a right-of-way application filed by NextLight Renewable Power, LLC, (Applicant) for the Silver State Solar Project. The proposed project would be located on BLM-administered public land in the Ivanpah Valley, 40 miles south of Las Vegas, in Clark County, Nevada. Specifically, the site is on unincorporated land approximately 2 miles east of Primm, Nevada.

Silver State Solar Energy Project (NVN-085077)

Author :
Publisher :
Page : pages
File Size : 47,26 MB
Release : 2010
Category : Clark County (Nev.)
ISBN :

GET BOOK

The Bureau of Land Management (BLM) Renewable Energy Coordinating Office has prepared this Draft Environmental Impact Statement (EIS) in response to a right-of-way application submitted by NextLight Renewable Power, LLC (Applicant or Proponent) to construct and operate the Silver State Solar Project. The proposed project would be located on BLM-administered lands, approximately 2 miles east of Primm, in Clark County, Nevada. The Proponent is proposing to construct a concentrated solar thermal parabolic trough power plant facility, which is expected to operate for approximately 50 years. The proposed project would utilize solar photovoltaic technology, to produce 400 megawatts (MW) of renewable energy.

Final Supplemental Environmental Impact Statement for South Operations Area Project Amendment, Cumulative Effects

Author : United States. Bureau of Land Management. Elko District
Publisher :
Page : 0 pages
File Size : 40,99 MB
Release : 2010
Category : Gold mines and mining
ISBN :

GET BOOK

This Final EIS supplements the cumulative effects analyses originally presented in the Final SOAP EIS for the project by providing expanded and updated analyses of cumulative effects consistent with the recent decision by the U.S. Court of Appeals for the Ninth Circuit - Great Basin Mine Watch v. Hankins. The cumulative effects analyses in this Final SEIS incorporates qualitative and quantitative data collected since 2002; expanded analyses of cumulative effects of the project combined with other mining and land uses where appropriate; and descriptions of analytical processes used to determine cumulative effects.