Author : United States. Federal Highway Administration
Publisher :
Page : pages
File Size : 17,47 MB
Release : 2006
Category : Express highways
ISBN :
[PDF] Final Environmental Impact Statement East West Corridor Highway Component eBook
Final Environmental Impact Statement East West Corridor Highway Component Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Final Environmental Impact Statement East West Corridor Highway Component book. This book definitely worth reading, it is an incredibly well-written.
East-West Corridor Highway Component, I-310/airport to CBD, Jefferson, Orleans, and St. Charles Parishes
Author :
Publisher :
Page : 516 pages
File Size : 46,90 MB
Release : 2007
Category :
ISBN :
Draft Environmental Impact Statement East-West Corridor Highway Component
Author : United States. Federal Highway Administration
Publisher :
Page : pages
File Size : 29,60 MB
Release : 2005
Category : Express highways
ISBN :
SR 28 (Sunset Highway), Eastside Corridor Project
Author :
Publisher :
Page : 1182 pages
File Size : 48,19 MB
Release : 2006
Category :
ISBN :
Southwest Freeway/transitway Project Final Environmental Impact Statement, FHWA-TX-EIS-85-01-F
Author :
Publisher :
Page : 430 pages
File Size : 13,3 MB
Release : 1985
Category : Bus lanes
ISBN :
Norfolk-Virginia Beach Light Rail Transit System East/West Corridor Project, City of Norfolk, City of Virginia Beach, Virginia
Author :
Publisher :
Page : 692 pages
File Size : 18,65 MB
Release : 2000
Category :
ISBN :
Supplement Draft Environmental Impact Statement and Section 4(f) Evaluation
Author :
Publisher :
Page : 0 pages
File Size : 16,38 MB
Release : 2020
Category : Express highways
ISBN :
"The I-94 East-West Corridor study area is from 70th Street to 16th Street, a distance of about 3.5 miles. This corridor has safety issues, closely spaced interchanges, a combination of left-hand and right-hand exit and entrance ramps, and deteriorated pavement. As traffic increases, safety and traffic operations on this corridor will continue to deteriorate. By 2050, increased traffic volumes will cause nearly this entire section of I-94 to operate at level of service D to F during peak periods. The Final Environmental Impact Statement (EIS) was approved in 2016. The Final EIS evaluated the social, environmental, and economic impacts of the No-build alternative and a range of Build Alternatives, as well as the extent to which these alternatives address the project’s purpose and need. WisDOT and FHWA prepared a Supplemental EIS to incorporate the most up-to-date data, updated environmental regulations, changes to the alternatives, and public and agency input since the 2016 Final EIS."-- Abstract
East-West Multimodal Corridor EIS and Major Investment Study, Dade County
Author :
Publisher :
Page : 766 pages
File Size : 31,50 MB
Release : 1998
Category :
ISBN :
Final Environmental Impact Statement for the Proposed Routes 1 & I-105 (El Segundo-Norwalk) Freeway-transitway: Environmental assessment & sec. 4(f) statement
Author :
Publisher :
Page : 598 pages
File Size : 38,93 MB
Release : 1978
Category :
ISBN :
Federal Register
Author :
Publisher :
Page : 1160 pages
File Size : 25,64 MB
Release : 2000-06-22
Category : Administrative law
ISBN :