[PDF] Draft Supplemental Environmental Impact Statement For The Silver State Solar South Project And Proposed Las Vegas Field Office Resource Management Plan Amendment eBook

Draft Supplemental Environmental Impact Statement For The Silver State Solar South Project And Proposed Las Vegas Field Office Resource Management Plan Amendment Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Draft Supplemental Environmental Impact Statement For The Silver State Solar South Project And Proposed Las Vegas Field Office Resource Management Plan Amendment book. This book definitely worth reading, it is an incredibly well-written.

Federal Register

Author :
Publisher :
Page : 138 pages
File Size : 15,66 MB
Release : 2014
Category : Delegated legislation
ISBN :

GET BOOK

Final Environmental Impact Statement for the Silver State Solar Energy Project (NVN-085077)

Author : United States. Bureau of Land Management. Las Vegas Field Office
Publisher :
Page : pages
File Size : 36,79 MB
Release : 2010
Category : Electric power transmission
ISBN :

GET BOOK

The Bureau of Land Management (BLM) Las Vegas Field Office has prepared this Final Environmental Impact Statement (FEIS) in response to a right-of-way application filed by NextLight Renewable Power, LLC, (Applicant) for the Silver State Solar Project. The proposed project would be located on BLM-administered public land in the Ivanpah Valley, 40 miles south of Las Vegas, in Clark County, Nevada. Specifically, the site is on unincorporated land approximately 2 miles east of Primm, Nevada.

Draft Supplemental Environmental Impact Statement/environmental Impact Report/land Use Plan Amendment for the Palen Solar Project (formerly Palen Solar Power Project)

Author :
Publisher :
Page : pages
File Size : 23,19 MB
Release : 2017
Category : Environmental impact statements
ISBN :

GET BOOK

The Supplemental Environmental Impact Statement/Environmental Impact Report/Plan Amendment (Supplemental EIS/EIR) is in response to an amendment to an application for a Right-of-Way (ROW) grant authorizing the construction, operation, maintenance, and decommissioning of a solar photovoltaic generating facility known as the Palen Solar Project (Project) and the transmission of energy generated by the Project to the grid via Southern California Edison's Red Bluff Substation. The project area is in eastern Riverside County, California and covers approximately 4,200 acres of land managed by the BLM.

Silver State Solar Energy Project (NVN-085077)

Author :
Publisher :
Page : pages
File Size : 38,93 MB
Release : 2010
Category : Clark County (Nev.)
ISBN :

GET BOOK

The Bureau of Land Management (BLM) Renewable Energy Coordinating Office has prepared this Draft Environmental Impact Statement (EIS) in response to a right-of-way application submitted by NextLight Renewable Power, LLC (Applicant or Proponent) to construct and operate the Silver State Solar Project. The proposed project would be located on BLM-administered lands, approximately 2 miles east of Primm, in Clark County, Nevada. The Proponent is proposing to construct a concentrated solar thermal parabolic trough power plant facility, which is expected to operate for approximately 50 years. The proposed project would utilize solar photovoltaic technology, to produce 400 megawatts (MW) of renewable energy.

Draft Environmental Impact Statement and California Desert Conservation Area Plan Amendment for the Proposed Chevron Energy Solutions Lucerne Valley Solar Project

Author : United States. Bureau of Land Management. Barstow Field Office
Publisher :
Page : pages
File Size : 46,1 MB
Release : 2010
Category : California Desert National Conservation Area (Calif.)
ISBN :

GET BOOK

Chevron Energy Solutions (CES) is proposing to develop a 45-megawatt (MW) solar photovoltaic (PV) plant and associated facilities on 516 acres of federal land managed by the Bureau of Land Management (BLM). The site of CES's proposed action is located on unincorporated land in the Mojave Desert, approximately eight miles east of Lucerne Valley.

Silver State Solar Energy Project (NVN-085077)

Author :
Publisher :
Page : 0 pages
File Size : 16,67 MB
Release : 2010
Category : Clark County (Nev.)
ISBN :

GET BOOK

The Bureau of Land Management (BLM) Renewable Energy Coordinating Office has prepared this Draft Environmental Impact Statement (EIS) in response to a right-of-way application submitted by NextLight Renewable Power, LLC (Applicant or Proponent) to construct and operate the Silver State Solar Project. The proposed project would be located on BLM-administered lands, approximately 2 miles east of Primm, in Clark County, Nevada. The Proponent is proposing to construct a concentrated solar thermal parabolic trough power plant facility, which is expected to operate for approximately 50 years. The proposed project would utilize solar photovoltaic technology, to produce 400 megawatts (MW) of renewable energy.