[PDF] Defense Base Realignment And Closure Budget Data For The Construction Of Family Housing At Naval Air Station Pensacola Florida eBook

Defense Base Realignment And Closure Budget Data For The Construction Of Family Housing At Naval Air Station Pensacola Florida Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Defense Base Realignment And Closure Budget Data For The Construction Of Family Housing At Naval Air Station Pensacola Florida book. This book definitely worth reading, it is an incredibly well-written.

Defense Base Realignment and Closure Budget Data for Naval Air Technical Training Center, Naval Air Station Pensacola, Florida

Author :
Publisher :
Page : 0 pages
File Size : 27,92 MB
Release : 1994
Category :
ISBN :

GET BOOK

The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of 19 projects, valued at $288.9 million, for the realignment of the Naval Air Technical Training Center from Naval Air Station Memphis, Tennessee, to Naval Air Station Pensacola, Florida. The audit also evaluated the implementation of the DoD Internal Management Control Program and assessed the adequacy of applicable internal controls.

Defense Base Realignment and Closure Budget Data for Naval Air Station, Jacksonville, Florida

Author :
Publisher :
Page : 27 pages
File Size : 39,54 MB
Release : 1997
Category :
ISBN :

GET BOOK

The overall audit objective was to determine the accuracy of Defense BRAC military construction budget data. Another objective was to assess the adequacy of the management control program as it applied to the overall audit objective. We did not assess the adequacy of the management control program as part of this audit because it will be discussed in a summary report on FY 1998 Defense BRAC military construction budget data.

Defense Base Realignment and Closure Budget Data for the Construction of Family Housing at Altus Air Force Base, Oklahoma

Author :
Publisher :
Page : 17 pages
File Size : 41,32 MB
Release : 1996
Category :
ISBN :

GET BOOK

The overall audit objective was to determine the accuracy of BRAC MILCON budget data. The specific objectives were to determine whether the proposed project was a valid BRAC requirement, whether the decision for MILCON was supported with required documentation including an economic analysis, and whether the economic analysis considered existing facilities. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective. The management control program objective will be discussed in a summary report of FY 1997 BRAC MILCON budget data.

Defense Base Realignment and Closure Budget Data for Closing Naval Air Station Cecil Field, Florida, and Realigning Projects to Various Sites

Author :
Publisher :
Page : 0 pages
File Size : 44,24 MB
Release : 1994
Category :
ISBN :

GET BOOK

The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of seven projects, valued at $21.4 million, associated with the closure of Naval Air Station Cecil Field, Florida, and the realignment of aircraft and dedicated personnel, equipment, and support services to Naval Air Station Oceana, Virginia; Marine Corps Air Station Cherry Point, North Carolina; and Marine Corps Air Station Beaufort, South Carolina. Audit Results. For the seven projects, the Navy did not adequately determine the scope and the most economical way to accommodate the assigned mission. As a result, seven projects, estimated to cost $21.4 million, could not be validated and are therefore questionable. However, an economic analysis provided in response to a draft of this report, completed April 8, 1994, by the Office of the Deputy Assistant Secretary of Defense (Health Services Operations) validated one project for $3.1 million. See the finding in Part II for details.