[PDF] Defense Base Realignment And Closure Budget Data For The Naval Surface Warfare Center Indian Head Maryland eBook

Defense Base Realignment And Closure Budget Data For The Naval Surface Warfare Center Indian Head Maryland Book in PDF, ePub and Kindle version is available to download in english. Read online anytime anywhere directly from your device. Click on the download button below to get a free pdf file of Defense Base Realignment And Closure Budget Data For The Naval Surface Warfare Center Indian Head Maryland book. This book definitely worth reading, it is an incredibly well-written.

Defense Base Realignment and Closure Budget Data for the Naval Surface Warfare Center, Indian Head, Maryland

Author :
Publisher :
Page : 61 pages
File Size : 18,86 MB
Release : 1995
Category :
ISBN :

GET BOOK

The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of one project, valued at $10.3 million, for the realignment of explosive research functions, personnel, and equipment at Naval Surface Warfare Center, White Oak, Maryland, to Naval Surface Warfare Center, Indian Head, Maryland.

Defense Base Closure and Realignment Budget Data for the Naval Surface Warfare Center

Author :
Publisher :
Page : 37 pages
File Size : 11,16 MB
Release : 1993
Category :
ISBN :

GET BOOK

The overall objective of the audit was to evaluate significant cost increases over the estimated costs provided to the 1991 Defense Base Closure and Realignment Commission for base closure and realignment military construction projects. This report provides the results of the audit related to the realignment of Naval Surface Warfare Centers elements in White Oak, Maryland, and Panama City, Florida, to Dahlgren, Virginia; and the realignment of the Naval Surface Warfare Center element in Annapolis, Maryland, to Carderock, Maryland. Three projects were in the FY 1993 military construction package for the Naval Surface Warfare Center; one at Dahlgren and two at Carderock.

Base Closure and Realignment Budget Data for the Naval Surface Warfare Center

Author :
Publisher :
Page : 0 pages
File Size : 44,69 MB
Release : 1993
Category :
ISBN :

GET BOOK

Introduction. The audit was directed by Public Law 102-190, "National Defense Authorization Act for Fiscal Years 1992 and 1993," December 5, 1991. The Public Law states that the Secretary of Defense shall ensure that the amount of the authorization requested by DoD for each military construction project associated with base realignment and closure actions does not exceed the original estimated cost provided to the Base Closure and Realignment Commission (the Commission). The Secretary of Defense is required to explain to Congress the reasons for the differences between the original project cost estimate provided to the Commission and the requested budget amount. The Inspector General, DoD, is required to review each military construction project for which a significant difference exists and to provide the results of the review to the congressional Defense committees. This report is one in a series of reports relating to FY 1994 military construction costs for realigning and closing bases.

Defense Base Realignment and Closure Budget Data for the Move of the Naval Air Warfare Center, Aircraft Division, Trenton, New Jersey, to the Naval Air Warfare Center, Aircraft Division, Patuxent River, Maryland, and Arnold Air Force, Tennessee

Author :
Publisher :
Page : 39 pages
File Size : 15,72 MB
Release : 1995
Category :
ISBN :

GET BOOK

The overall audit objective was to determine the accuracy of Defense Base Realignment and Closure Military Construction budget data. The specific objectives were to determine whether the proposed projects were valid Base Realignment and Closure requirements, whether the decision for Military Construction was supported with required documentation including an economic analysis, and whether the economic analysis considered existing facilities.

Semiannual Report to the Congress

Author : United States. Dept. of Defense. Office of the Inspector General
Publisher :
Page : 96 pages
File Size : 31,42 MB
Release : 1995
Category :
ISBN :

GET BOOK

Defense Base Realignment and Closure Budget Data for the Realignment of the Bureau of Naval Personnel, Washington, D.C., to Naval Air Station Memphis, Tennessee

Author :
Publisher :
Page : 0 pages
File Size : 44,3 MB
Release : 1995
Category :
ISBN :

GET BOOK

Public Law 102-190, "National Defense Authorization Act for Fiscal Years 1992 and 1993," December 5, 1991, directs the Secretary of Defense to ensure that the amount of the authorization that DoD requested for each military construction project associated with Defense base realignment and closure does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission). If the requested budget amounts exceed the original project cost estimates provided to the Commission, the Secretary of Defense is required to explain to Congress the reasons for the differences. The Inspector General, DoD, is required to review each Defense base realignment and closure military construction project for which a significant difference exists from the original cost estimate and to provide the results of the review to the congressional Defense committees. This report is one in a series of reports about FY 1996 Defense base realignment and closure military construction costs.

Defense Base Realignment and Closure Budget Data for Realignment of the Defense Courier Service Station, South Weymouth Naval Air Station, Massachusetts, to McGuire Air Force Base, New Jersey

Author :
Publisher :
Page : 27 pages
File Size : 10,46 MB
Release : 1998
Category :
ISBN :

GET BOOK

This report is one in a series about FY 1999 Defense base realignment and closure military construction costs. Public Law 102-190, "National Defense Authorization Act for Fiscal Years 1992 and 1993," December 5, 1991, directs the Secretary of Defense to ensure that the amount of the authorization that DoD requested for each Defense base realignment and closure military construction project does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission). If the requested budget amounts exceed the original project cost estimates provided to the Commission, the Secretary of Defense is required to explain to Congress the reasons for the differences. The Office of the Inspector General, DoD, is required to review each Defense base realignment and closure military construction project for which a significant difference exists from the original cost estimate, and to provide the results of the review to the congressional Defense committees. The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides results of the audit of one project, valued at $850,000, for the realignment of Defense Courier Service Station from South Weymouth Naval Air Station, Massachusetts to McGuire Air Force Base, New Jersey. A review of the management control program, as it applies to the overall audit objective, is reported in Inspector General, DoD Report No. 98-17S, "Summary Report on the Audit of Defense Base Realignment and Closure Budget Data for FYs 1997 and 1998," July 2,1998. Therefore, the adequacy of the management control program will not be discussed in this report.